Kesi za Mradi

  • Jina la Mteja: Shirika la Gridi ya Taifa la China

    Jina la mradi: Kampuni ya Gridi ya Serikali ya Shaanxi 2021 ya tatu Inatoa Zabuni Iliyokolea

    Maagizo ya Mradi:The State Grid Shaanxi Electric Power Company is an enterprise directly under the Government of China and has strict requirements for external bidding.

    Our group participated in this bidding. We are pointed to supply for Xi'an Qintang 110kV Transmission and Transformation Project, Shaanxi Xi'an Taiyi 110kV Transmission and Transformation Project, Weinan Pucheng 10KV Dianzi Line Renovation Project, Weinan Hancheng 10KV Sunan Line and Huandong Line Connection New Construction Project, and Yulin Dingbian 10KV Advanced Line Shilisha Branch Line Renovation Project,etc, total 21 projects.

    Yaliyomo kwenye Bidhaa:

    10KV-ZC-YJV22 3*400 kebo ya nguvu mita 16850

    10KV-ZC-YJV22 3*240 kebo ya nguvu mita 1260

    10KV-ZC-YJV22 3 * 70 cable nguvu mita 480

    10KV-ZC-YJV22 3*300 kebo ya nguvu mita 4550

    10KV-ZC-YJV22 3 * 120 cable nguvu mita 560

    10KV-ZC-YJV22 3 * 150 kebo ya nguvu mita 120

     

    Muda wa Ujenzi: Mwaka mmoja

  • Jina la Mteja: Kampuni ya China Southern Power Grid

    Jina la mradi: China Southern Power Grid Corporation 2020 vifaa vya mtandao wa usambazaji na vifaa kundi la pili la miradi ya zabuni ya mfumo

    Maagizo ya Mradi: China Southern Power Grid Company Limited is a central enterprise supervised by the State-owned Assets Supervision and Administration Commission of the State Council.

    Our group participated in this bidding. we are pointed to supply Jingyang Power Supply Station Bochuan Village Ganmeng Second Distribution Radio Area Renovation Project,Xintian Power Supply Station Shemen Village Qincun Terrace Renovation Project,Ningtan Power Supply Station Ningtan Village Weizhen 2 # Substation Renovation Project,Wendi Power Supply Station Wendi Village North Huojiang Terrace Renovation Project,etc, 24 projects total.

    Yaliyomo kwenye Bidhaa:

    Kebo za Juu,10kV,JKLGYJ-10-1×240/30, mita 60000

    Kebo za Juu,10kV,JKLGYJ-10-1×120/20, mita 54894

    Kebo za Juu,10kV,JKLGYJ-10-1×70/10, mita 875451

    Kebo za Juu,10kV,JKLGYJ-10-1×70/10, mita 875451

     Kebo za Juu,1kV,JKLYJ-1 1×120, mita 11132

    Kebo za Juu,1kV,JKLYJ-1 1×120, mita 11132

    Kebo za Juu,10kV,JKLYJ-1 1×70, mita 76812

    Kebo za Juu,1kV,JKLYJ-1 1×120, mita 147666

    Kebo za Juu,1kV,JKLYJ-1 1×240, mita 22348

    Kebo za Juu,1kV,JKLGYJ-10-1×240/30, mita 281486

    Kebo za Juu,10kV,JKLYJ-10-1×120, mita 278918

    Kebo za Juu,10kV,JKLYJ-10-1×185, mita 300000

    Kebo za Juu,10kV,JKLYJ-10-1×240, mita 343936

    Kebo za Juu,10kV,JKLYJ-10-1×70, mita 350952

     

    Muda wa Ujenzi: 1 mwaka

  • Jina la Mteja: China Railway Group Limited

    Jina la mradi: Mradi wa Ujenzi mpya wa Shenyang Hub wa Ofisi ya Sita ya Shenyang-Baihe Reli ya Kasi ya China

    Maagizo ya Mradi: The Shenyang to Baihe high-speed Railway is an important part of the national rapid railway network and a major project of "city-to-city high-speed railway" connectivity in Liaoning Province.

    The specific using environment of high-speed railway has strict requirements on the performance of power supply cable, which requires that the cable should have electrical reliability, operation safety, heat resistance, low smoke, halogen-free flame retardant performance, non-toxic, non-asbestos, oil resistance, salt spray corrosion resistance and other properties. 

    Yaliyomo kwenye Bidhaa: 

    Cable ya nguvu ya juu-voltage

    YJLY22-10-3*70

    YJLY22-10-3*95

    YJLY22-10-3*120

    YJLY22-10-3*240

    YJLY22-10-3*300

    YJLY22-10-3*500

     

    Muda wa Ujenzi: Mwaka mmoja

  • Jina la Mteja: Shirika la Gridi ya Taifa ya China

    Jina la mradi: Mradi wa zabuni ya hesabu wa Kampuni ya State Grid Sichuan 2022

    Maagizo ya Mradi:The State Grid Sichuan Company is an enterprise directly under the Government of China and has strict requirements for external bidding.

    Our group participated in this bidding. We are pointed to supply for State Grid Ya'an Xingjing Power Supply Company's 2022 Low Voltage Industry Expansion Supporting Project, and 10kV and below renovation project in Jiatuo Village, Wusihe Town, Hanyuan County, and Sichuan Ya'an Hanyuan 10kV Luoqing Line Fulin Town Qingfu Village Renovation Project, and 10kV and below renovation project in Zhonggang Village, Longdong Town, Baoxing County, etc, 28 projects total.

    Yaliyomo kwenye Bidhaa:

    Kebo za Juu,AC1kV,JKLGYJ,70/10 mita 656816

    Kebo za Juu,AC1kV,JKLGYJ,120/20 mita 43296

    Kebo za Juu,AC1kV,JKLGYJ,185/25 mita 24150

    Kebo za Juu,AC1kV,JKLYJ,70 924749 mita

    Kebo za Juu,AC1kV,JKLYJ,185 8965 mita

    Kebo za Juu,AC1kV,JKLYJ,120 79628 mita

    Kebo za Juu,AC1kV,JKLYJ,35 1498382 mita

    Kebo za Juu,AC1kV,JKLYJ,16 2149221 mita

    Kebo za Juu,AC1kV,JKLYJ,240 9198 mita

     

    Muda wa Ujenzi: Mwaka mmoja

  • Jina la Mteja: China Railway Construction Corporation Limited

    Jina la mradi: China Railway 16th Bureau Group Co., Ltd. Mradi wa Usafiri wa Reli wa Hohhot

    Maagizo ya Mradi: Miradi kumi muhimu ya Hohhot mwaka wa 2023, urefu wa jumla wa awamu ya kwanza ya mradi ni 49.5km, na uwekezaji wa mradi ni yuan bilioni 35.569 kwa jumla. Mradi huo umeorodheshwa katika mradi wa kitaifa wa maonyesho ya PPP, na umeungwa mkono na hazina maalum ya kitaifa ya ujenzi. Insulation na kuzuia maji Katika kesi ya conductivity nzuri ya umeme, cable lazima iwe na insulation nzuri na upinzani wa maji. Cable lazima inafaa kwa mazingira ya nje ya nje na inaweza kufanya kazi kwa utulivu kwa muda mrefu. Kwa ujumla, kebo pia inahitajika kuwa na uzito mwepesi, kubadilika vizuri, rahisi kuinama, rahisi kufunga na kudumisha. 

    Yaliyomo kwenye Bidhaa: Kebo ya 10KV XLPE

  • Jina la Mteja: China Railway Group Limited

    Jina la mradi: Ofisi ya Umeme ya China Railway Electrification Group First Engineering Co., Ltd. Mradi wa Hoteli ya Kimataifa ya Xiong'an

    Maagizo ya Mradi: Mradi huu unashughulikia eneo la takriban mita za mraba 800,000, na eneo la jumla la ujenzi wa takriban mita za mraba 190,000. Ni kituo cha kimataifa cha kina cha biashara na usafiri, chenye jumla ya majengo 15 ya watu binafsi, ikijumuisha hoteli 1 ya kimataifa, kituo 1 cha mikutano cha kimataifa na majengo 13 ya mapokezi ya VIP. Kiasi cha cable ni kubwa, kuna mahitaji fulani maalum kwa ubora wa msingi wa kondakta, kama vile kubadilika, na cable inapaswa kuwa na kuwaka fulani na upinzani wa joto la juu.

    Yaliyomo kwenye Bidhaa: 

    0.6/1kV Power Cable, 8.7/15kV High-voltage Power Cable

    YJV-0.6/1kV 4×70

    YJV-0.6/1kV 1-4×50-1×25

    ZA-Y JV22-8.7/15KV 3*400

    ZA-Y JV22-8.7/15KV 3*120

     

    Muda wa Ujenzi: Mwaka mmoja

  • Jina la Mteja: Shanxi Xiaolangdi Yellow Diversion Engineering Co., Ltd

    Jina la mradi: Mradi wa Uhifadhi wa Maji wa Mto Manjano Xiaolangdi

    Maagizo ya Mradi: It is a national key construction project during the "eighth Five-Year Plan" period. It is a large-scale comprehensive water conservancy project integrating silting reduction, flood control, ling control, water supply and irrigation, power generation on the main stream of the Yellow River.

    It is a key project for the governance and development of the Yellow River. In the process of using cable in water conservancy engineering, it is necessary to consider the laying environment of cable, power supply voltage, current capacity and other factors, and select the cable type with strong water resistance, good durability, good corrosion resistance, wide applicability and other suitable performance.

    Yaliyomo kwenye Bidhaa: Cable ya Nguvu, Kebo ya Kudhibiti

    ZRA-YJY23-5×10

    ZRA-YJY23-3×185

    ZRA-YJY23-3×70

    WDZA-KYJYRP2-23-4×1.5

    WDZA-KY JYRP2-23-7×1.5 

     

    Muda wa Ujenzi: siku 45

  • Jina la Mteja: China Railway Group Limited

    Jina la mradi: China Railway First Bureau Group Group Xi'an Bahe Tunnel Project

    Maagizo ya Mradi:Urefu wa jumla wa mradi ni mita 758, kipenyo cha handaki ni mita 2.6, iko chini ya ardhi mita 28.6. Ni mradi wa msingi wa maendeleo ya sekta ya ndani, Xi 'ni mradi wa ujenzi wa vifaa vya manispaa. Kebo ya umeme ya handaki ya mradi inahitaji sana kwa utulivu wa ubora, utaratibu wa ujenzi, utendaji wa upinzani wa mazingira.

    Yaliyomo kwenye Bidhaa: Cable ya nguvu

    WDZBN-YJY-5×16  

    WDZBN-YJY-3×50+2×25  

    WDZBN-YJY-3×185+2×95

    WDZBN-YJY-4×50+1×25

    WDZBN-YJY-4×150+1×70

    WDZBN-YJY-3×35+1×16

    WDZBN-YJY-5×10

    WDZBN-YJY-5×4

     

    Muda wa Ujenzi: Miezi 2

  • Jina la Mteja: Ujenzi wa Jimbo la China

    Jina la mradi: Ofisi ya Nane ya Uhandisi ya Ujenzi wa Jimbo la China Co., Ltd. Mradi wa Kujenga upya Shule ya Kati ya Shijiazhuang nambari 40

    Maagizo ya Mradi: Mradi huu ni mradi muhimu katika ngazi ya manispaa, na njia ya usambazaji umeme ya chuo inapaswa kuhakikisha uthabiti na usalama wa usambazaji wa nishati, kupunguza kuingiliwa kwa sumaku-umeme na gharama za matengenezo.

    Yaliyomo kwenye Bidhaa: Kebo ya Nguvu, Kebo ya Kudhibiti, Kebo isiyoweza kushika moto, Kebo ya Wiring ya Nyumbani

    WDZN-BYJ-2.5

    WDZN-BYJ-4

    WDZN-BYJ-6

    NH-KVV-5*2.5

    NH-KVV-8*1.5

    YA-A-4*6+E6

    YA-A-4*70+1*35

    NH-BV-2.5

    NH-RVV-2*4

  • Jina la Mteja: China Railway Construction Corporation Limited

    Jina la mradi: China Railway 17th Bureau Group Construction Engineering Co., Ltd. Mradi wa Kuhamisha Hospitali ya Afya ya Mama na Mtoto ya Taiyuan

    Maagizo ya Mradi: Mradi muhimu wa mradi wa "Hundred-hospital Xing Medical" katika Jiji la Taiyuan, wenye jumla ya eneo la sakafu la mita za mraba 1,92,981.6 na sakafu 12 katika jengo kuu, na uwekezaji wa jumla wa takriban RMB1.23 bilioni, na vitanda 1,500 vilivyoundwa. , Kwa kuegemea kwa mfumo wa usambazaji wa nguvu, mfumo wa kinga na mfumo wa kutuliza, ulinzi wa mazingira ya kijani ni muhimu sana. Katika muundo wa umeme, upinzani wa harmonic, moshi mdogo, retardant ya moto isiyo na halogen, upinzani wa maji na upinzani wa unyevu, upinzani wa mchwa, upinzani wa panya na sifa nyingine huzingatiwa.

    Yaliyomo kwenye Bidhaa: Kebo ya Nguvu, Kebo ya Kudhibiti, Kebo ya Wiring ya Nyumba

    WDZ-YJ(F)E 3*25+2*16

    WDZ-YJ(F)E 3*25+2*16

    KVV 4*1.0

    BV25

    BV2*1.0

    NH-RVS2*1.0

    ZR-RVS2*1.5

     

    Muda wa Ujenzi: Miaka miwili