-
Customer Name: The State Grid Corporation of China
Project Name: The State Grid Shaanxi Company 2021 third Supplies Concentrated Tendering
Project Instruction:The State Grid Shaanxi Electric Power Company is an enterprise directly under the Government of China and has strict requirements for external bidding.
Our group participated in this bidding. We are pointed to supply for Xi'an Qintang 110kV Transmission and Transformation Project, Shaanxi Xi'an Taiyi 110kV Transmission and Transformation Project, Weinan Pucheng 10KV Dianzi Line Renovation Project, Weinan Hancheng 10KV Sunan Line and Huandong Line Connection New Construction Project, and Yulin Dingbian 10KV Advanced Line Shilisha Branch Line Renovation Project,etc, total 21 projects.
Product Contents:
10KV-ZC-YJV22 3*400 power cable 16850 meters
10KV-ZC-YJV22 3*240 power cable 1260 meters
10KV-ZC-YJV22 3*70 power cable 480 meters
10KV-ZC-YJV22 3*300 power cable 4550 meters
10KV-ZC-YJV22 3*120 power cable 560 meters
10KV-ZC-YJV22 3*150 power cable 120 meters
Construction Duration: One year
-
Customer Name: China Southern Power Grid Company
Project Name: China Southern Power Grid Corporation 2020 distribution network equipment and materials second batch of framework bidding projects
Project Instruction: China Southern Power Grid Company Limited is a central enterprise supervised by the State-owned Assets Supervision and Administration Commission of the State Council.
Our group participated in this bidding. we are pointed to supply Jingyang Power Supply Station Bochuan Village Ganmeng Second Distribution Radio Area Renovation Project,Xintian Power Supply Station Shemen Village Qincun Terrace Renovation Project,Ningtan Power Supply Station Ningtan Village Weizhen 2 # Substation Renovation Project,Wendi Power Supply Station Wendi Village North Huojiang Terrace Renovation Project,etc, 24 projects total.
Product Contents:
Overhead Cables,10kV,JKLGYJ-10-1×240/30, 60000 meters
Overhead Cables,10kV,JKLGYJ-10-1×120/20, 54894 meters
Overhead Cables,10kV,JKLGYJ-10-1×70/10, 875451 meters
Overhead Cables,10kV,JKLGYJ-10-1×70/10, 875451 meters
Overhead Cables,1kV,JKLYJ-1 1×120, 11132 meters
Overhead Cables,1kV,JKLYJ-1 1×120, 11132 meters
Overhead Cables,10kV,JKLYJ-1 1×70, 76812 meters
Overhead Cables,1kV,JKLYJ-1 1×120, 147666 meters
Overhead Cables,1kV,JKLYJ-1 1×240, 22348 meters
Overhead Cables,1kV,JKLGYJ-10-1×240/30, 281486 meters
Overhead Cables,10kV,JKLYJ-10-1×120, 278918 meters
Overhead Cables,10kV,JKLYJ-10-1×185, 300000 meters
Overhead Cables,10kV,JKLYJ-10-1×240, 343936 meters
Overhead Cables,10kV,JKLYJ-10-1×70, 350952 meters
Construction Duration: 1 year
Customer Name: China Railway Group Limited
Project Name: Shenyang Hub Reconstruction Project of Shenyang-Baihe High-speed Railway of China Railway Sixth Bureau
Project Instruction: The Shenyang to Baihe high-speed Railway is an important part of the national rapid railway network and a major project of "city-to-city high-speed railway" connectivity in Liaoning Province.
The specific using environment of high-speed railway has strict requirements on the performance of power supply cable, which requires that the cable should have electrical reliability, operation safety, heat resistance, low smoke, halogen-free flame retardant performance, non-toxic, non-asbestos, oil resistance, salt spray corrosion resistance and other properties.
Product Contents:
High-voltage power cable
YJLY22-10-3*70
YJLY22-10-3*95
YJLY22-10-3*120
YJLY22-10-3*240
YJLY22-10-3*300
YJLY22-10-3*500
Construction Duration: One year
Customer Name: State Grid Corporation of China
Project Name: The State Grid Sichuan Company 2022 inventory bidding project
Project Instruction:The State Grid Sichuan Company is an enterprise directly under the Government of China and has strict requirements for external bidding.
Our group participated in this bidding. We are pointed to supply for State Grid Ya'an Xingjing Power Supply Company's 2022 Low Voltage Industry Expansion Supporting Project, and 10kV and below renovation project in Jiatuo Village, Wusihe Town, Hanyuan County, and Sichuan Ya'an Hanyuan 10kV Luoqing Line Fulin Town Qingfu Village Renovation Project, and 10kV and below renovation project in Zhonggang Village, Longdong Town, Baoxing County, etc, 28 projects total.
Product Contents:
Overhead Cables,AC1kV,JKLGYJ,70/10 656816 meters
Overhead Cables,AC1kV,JKLGYJ,120/20 43296 meters
Overhead Cables,AC1kV,JKLGYJ,185/25 24150 meters
Overhead Cables,AC1kV,JKLYJ,70 924749 meters
Overhead Cables,AC1kV,JKLYJ,185 8965 meters
Overhead Cables,AC1kV,JKLYJ,120 79628 meters
Overhead Cables,AC1kV,JKLYJ,35 1498382 meters
Overhead Cables,AC1kV,JKLYJ,16 2149221 meters
Overhead Cables,AC1kV,JKLYJ,240 9198 meters
Construction Duration: One year
Customer Name: China Railway Construction Corporation Limited
Project Name: China Railway 16th Bureau Group Co., Ltd. Hohhot Rail Transit Project
Project Instruction: Hohhot's top ten key projects in 2023, the total length of the first phase of the project is 49.5km, and the project investment is 35.569 billion yuan in total. The project has been listed in the national PPP demonstration project, and has been supported by the national construction special fund. Insulation and waterproof In the case of good electrical conductivity, the cable must have good insulation and water resistance. The cable must be suitable for extreme outdoor environments and can operate stably for a long time. Generally, the cable is also required to have light weight, good flexibility, easy to bend, easy to install and maintain.
Product Contents: 10KV XLPE cable
Customer Name: China Railway Group Limited
Project Name: China Railway Electrification Bureau Group First Engineering Co., Ltd. Xiong'an International Hotel Project
Project Instruction: The project covers an area of about 800,000 square meters, with a total construction area of about 190,000 square meters. It is an international comprehensive business and travel center, with a total of 15 individual buildings, including 1 international hotel, 1 international conference center and 13 VIP reception buildings. The amount of cable is large, there are certain special requirements for the quality of conductor core, such as flexibility, and the cable should have certain flammability and high temperature resistance.
Product Contents:
0.6/1kV Power Cable, 8.7/15kV High-voltage Power Cable
YJV-0.6/1kV 4×70
YJV-0.6/1kV 1-4×50-1×25
ZA-Y JV22-8.7/15KV 3*400
ZA-Y JV22-8.7/15KV 3*120
Construction Duration: One year
Customer Name: Shanxi Xiaolangdi Yellow Diversion Engineering Co., Ltd
Project Name: The Yellow River Xiaolangdi Water Conservancy Project
Project Instruction: It is a national key construction project during the "eighth Five-Year Plan" period. It is a large-scale comprehensive water conservancy project integrating silting reduction, flood control, ling control, water supply and irrigation, power generation on the main stream of the Yellow River.
It is a key project for the governance and development of the Yellow River. In the process of using cable in water conservancy engineering, it is necessary to consider the laying environment of cable, power supply voltage, current capacity and other factors, and select the cable type with strong water resistance, good durability, good corrosion resistance, wide applicability and other suitable performance.
Product Contents: Power Cable, Control Cable
ZRA-YJY23-5×10
ZRA-YJY23-3×185
ZRA-YJY23-3×70
WDZA-KYJYRP2-23-4×1.5
WDZA-KY JYRP2-23-7×1.5
Construction Duration: 45 days
Customer Name: China Railway Group Limited
Project Name: China Railway First Bureau Group Xi'an Bahe Tunnel Project
Project Instruction:The total length of the project is 758 meters, the tunnel diameter is 2.6 meters, located in the underground 28.6 meters. It is the basic project of domestic local industry development, Xi 'an municipal supporting facilities construction project. The project tunnel power cable requires highly for quality stability, constructing procedure, environmental resistance performance.
Product Contents: Power cable
WDZBN-YJY-5×16
WDZBN-YJY-3×50+2×25
WDZBN-YJY-3×185+2×95
WDZBN-YJY-4×50+1×25
WDZBN-YJY-4×150+1×70
WDZBN-YJY-3×35+1×16
WDZBN-YJY-5×10
WDZBN-YJY-5×4
Construction Duration: 2 months