The Yellow River Xiaolangdi Water Conservancy Project

Nov 04, 2025

Customer Name: Shanxi Xiaolangdi Yellow Diversion Engineering Co., Ltd


Project Name: The Yellow River Xiaolangdi Water Conservancy Project


Project Instruction: It is a national key construction project during the "eighth Five-Year Plan" period. It is a large-scale comprehensive water conservancy project integrating silting reduction, flood control, ling control, water supply and irrigation, power generation on the main stream of the Yellow River. It is a key project for the governance and development of the Yellow River. In the process of using cable in water conservancy engineering, it is necessary to consider the laying environment of cable, power supply voltage, current capacity and other factors, and select the cable type with strong water resistance, good durability, good corrosion resistance, wide applicability and other suitable performance.


The Yellow River Xiaolangdi Water Conservancy Project


Product Contents: Power Cable, Control Cable

ZRA-YJY23-5×10

ZRA-YJY23-3×185

ZRA-YJY23-3×70

WDZA-KYJYRP2-23-4×1.5

WDZA-KY JYRP2-23-7×1.5

Construction Duration: 45 days