Customer Name: China Railway Group Limited


Project Name: China Railway First Bureau Group Xi'an Bahe Tunnel Project


Project Instruction: The total length of the project is 758 meters, the tunnel diameter is 2.6 meters, located in the underground 28.6 meters. It is the basic project of domestic local industry development, Xi 'an municipal supporting facilities construction project. The project tunnel power cable requires highly for quality stability, constructing procedure, environmental resistance performance.


China Railway First Bureau Group Xi'an Bahe Tunnel Project


Product Contents: Power cable

WDZBN-YJY-5×16

WDZBN-YJY-3×50+2×25

WDZBN-YJY-3×185+2×95

WDZBN-YJY-4×50+1×25

WDZBN-YJY-4×150+1×70

WDZBN-YJY-3×35+1×16

WDZBN-YJY-5×10

WDZBN-YJY-5×4

Construction Duration: 2 months